Project Description

A garden project in Alyth combining the supply and installation of a Poly Crub tunnel with a full internal fit-out and associated groundworks.

The Poly Crub — a robust UV-protected polycarbonate tunnel with a pressure-treated timber base frame on a concrete foundation — was erected and fitted out internally with timber raised planter beds and a practical working area, complete with slatted potting benches and shelving. A custom stable door was fabricated and fitted to the end of the tunnel, allowing ventilation to be controlled throughout the growing season while maintaining security.

Beyond the tunnel itself, a pond was graded and formed on the site, shaping the surrounding ground to create a natural feature within the garden.

A straightforward but satisfying project, delivering a fully functional growing space ready for use from the ground up.

Project Details

Project Gallery

Ready to Begin Your Next Project?

Get expert advice, honest pricing, and reliable workmanship — all from a trusted local joiner in Perth with years of experience.

Scroll to Top